Storage Tanks
Bulk Capacity Tanks
Automated control equipment and inspections holes. Optional equipment: replaceable bottoms, lids, packings, temperature sensors, control and shut-off valves. The equipment documentation development period is 12 weeks. The production period is approximately 32 weeks.

LNG Storage Tanks
LNG storage tanks are cryogenic containers that hold liquefied natural gas at -162°C. They have a double-walled design with insulation between the inner and outer shells to maintain the extreme cold. This reduces the gas volume by 600 times for efficient storage. The promen eim sain deate weriod is 12 weeks.

Tank Containers
Tank containers (cisterns) are designed for the transportation of liquids, liquefied gases and a number of bulk products. A tank containeris a container consisting of a frame (frame elements) and a tank equipped with drain fittings and devices for unloading, both under the influence of gravity and under pressure. The equipment documentation development period is 12 weeks. The production period is approximately 32 weeks.

Download Our Products Catalogue
Explore our complete range of process equipment, pressure vessels, separation systems, storage tanks, modular solutions, and steel products. Download our catalogue to view detailed specifications and engineering capabilities.